On the left a cantilevered piece of concrete with a drip edge at 15 degrees.
On the right a metal flashing cast inot the concrete at time of the pour. You should imagine that this has a two piece to it one to get cast and the other to be installed after the membrane is installed.
No comments:
Post a Comment